Method

Five steps. You validate each one before the next.

Projects are deployed in phases. The schedule depends on your processes, your data and your integrations; it is defined in the proposal.

01

The five steps.

  1. 01

    Discovery call

    A 25-minute conversation to confirm the problem, the context and the fit. You provide a description of the process that gets stuck; you leave with a clear answer: Diagnostic, or nothing.

  2. 02

    Diagnostic

    Mapping of the priority process, the scope and the phases, then a written decision memo. You provide two or three interviews; you receive the memo and three options. It can conclude that nothing should be implemented.

  3. 03

    Implementation

    Configuration, automations, integrations and tests according to the agreed criteria. You grant our named access, limited to the engagement, and provide a data sample; you receive a connected, documented and tested process.

  4. 04

    Go-live

    Training, documentation, validation and controlled start. You validate each feature against the written criteria; the 30-day guarantee starts here.

  5. 05

    Ongoing service

    Support, Copilote or Managed service, depending on the level chosen. You receive monitoring, corrections and, depending on the level, follow-up drafts and the one-page report.

02

Our safeguards.

03

Your data, your control.

Your data, content, domain and accounts remain under your control. Rights to the deliverables specific to the engagement, EmTé’s reusable modules and third-party technologies are defined in writing before the project begins.

Request a 25-minute call.

The first step, with no commitment.